assess.one – AI-powered business operations platform

Workflow Template

Tiling installation quality checklist Workflow

Captures a tiling installation quality inspection, records pass/fail on each check and overall result, notifies the customer, and if the inspection fails routes rectification work to the tiler and re-inspection to the inspector (looping up to twice) before confirming the final passed result.

Picture a tiler finishing a job and an inspector working through a checklist on site—lippage, grout, falls, adhesive coverage—then wondering how to track what happens if something fails. This workflow captures every check on a single inspection record, notifies the customer straight away, and if the result is a fail, automatically sends rectification work to the tiler and a re-inspection task back to the inspector, looping up to twice before locking in a final passed result. That means no one has to chase spreadsheets or remember to follow up—the record's status and timeline show exactly where each job stands.

Business Outcomes

  • Reduces time spent chasing rectification work and re-inspection follow-ups
  • Helps standardise what gets checked on every tiling job
  • Keeps customers informed automatically at each stage without manual emails
  • Makes it easier to see which jobs are pending, in rectification, or passed at a glance
  • Supports a documented timeline of checks, rectifications and re-inspections per job

Workflow Steps

Steps

  1. 1
    Create Inspection Recordcreate record

    Creates the tiling inspection record from the submitted checklist form.

  2. 2
    Set Status to Submittedupdate record

    Sets the inspection status to Submitted.

  3. 3
    Email Acknowledgementsend email

    Emails the customer an acknowledgement of the inspection with their reference number.

  4. 4
    Route on Overall Result

    Routes based on whether the overall inspection result is Pass or Fail.

    overall_result: "Pass"→Set Status to Passed
    overall_result: "Fail"→Set Status to Rectification
    Default→Set Status to Rectification
  5. 5
    Set Status to Passedupdate record

    Sets the inspection status to Passed when the overall result is a first-time Pass.

  6. 6
    Email Customer - Passedsend email

    Emails the customer confirming the tiling passed the quality inspection.

  7. 7
    Set Status to Rectificationupdate record

    Sets the inspection status to Rectification when the overall result is a Fail.

  8. 8
    Tiler: Rectification Taskcreate task

    Assigns the tiler a task due in 2 days to fix the failed checks and record the rectification and photos.

  9. 9
    Save Rectification to Recordupdate record

    Saves the rectification notes and photos to the inspection record.

  10. 10
    Inspector: Re-inspect Taskcreate task

    Assigns the inspector a task due in 1 day to re-inspect and record the result and notes.

  11. 11
    Save Re-inspection to Recordupdate record

    Saves the re-inspection result and notes to the inspection record.

  12. 12
    Route on Re-inspection Result

    Routes based on whether the re-inspection result is Pass or Fail.

    reinspection_result: "Pass"→Set Status to Passed (After Rectification)
    reinspection_result: "Fail"→Loop Back to Tiler
    Default→Loop Back to Tiler
  13. 13
    Loop Back to Tilerrestart from step

    Sends the job back to the tiler for further rectification when re-inspection still fails, up to 2 times.

  14. 14
    Set Status to Passed (After Rectification)update record

    Sets the inspection status to Passed after rectification and successful re-inspection.

  15. 15
    Email Customer - Rectified and Passedsend email

    Emails the customer confirming the tiling was rectified and passed the quality inspection.

Fields

  • Inspector Name*
  • Inspector Email*
  • Customer Name*
  • Customer Email*
  • Site Address*
  • Job Reference*
  • +19 more fields

Forms

Tiling Installation Quality Inspection

20 fields

Data Views

Tiling Inspections

site_address, job_reference, area_tiled, overall_result +1 more

Dashboard Widgets

Inspections by Inspection Status

Recommended integrations

Setup the following integrations to extend workflow capability.

  • Send email in the workflow

    AWS SES logoAWS SES
tiling installation quality checklisttilingchecklisttradetrades

Similar Workflows

Similar Categories

FAQs

Do I need to set this up for each job, or does it run automatically?

Once your workspace publishes the template, it's ready to use straight away—there's no setup project needed. Each new inspection starts when the request form is submitted, so your inspectors just fill in the checklist and the workflow takes care of statuses, notifications and routing from there.

Can my team change the checklist items to match how we work?

Yes, you can describe the change you want in plain English or edit the steps directly in the workflow editor. Earlier versions of the workflow are kept, so you can always see what changed and when.

Who is actually involved in this process day to day?

Inspectors submit the initial checklist and, if needed, carry out re-inspection tasks. Tilers are assigned rectification tasks when a job fails, with a task the workflow waits for before moving on. Both are workspace members, and tasks are assigned directly to them rather than needing separate sign-off from someone else.

What happens when an inspection fails on the first check?

The record's status is set to Rectification and the tiler is assigned a task due in 2 days to fix the failed items and record what was done, along with photos. That information is saved to the inspection record, then the inspector gets a re-inspection task due the next day.

What if the re-inspection fails again?

The job is routed back to the tiler for further rectification, and this loop between tiler and inspector can repeat up to twice. If it eventually passes, the status is set to Passed and the customer is emailed to confirm the tiling was rectified and passed inspection.

Does the customer need to log in to see updates?

No, customers don't need an account at any point. They're kept informed by email—an acknowledgement with their reference number when the inspection is submitted, and a follow-up confirming a pass, either on the first check or after rectification.

Is this suitable for jobs with photos and measurements, not just yes/no checks?

Yes, the checklist form captures measurements like lippage and fall readings alongside pass/fail checks, plus inspection photos. Rectification and re-inspection tasks also capture photos and notes, all saved to the same inspection record.

How do we track the status of jobs across multiple sites?

Every inspection is a record with a reference number, a status such as Submitted, Rectification or Passed, and a timeline of what's happened. Table views and dashboards let you see records grouped by status, so you can spot which jobs are still in rectification at a glance.

Does this workflow keep records for compliance purposes?

The workflow records the statuses, checklist entries, measurements, photos and notes that staff enter, along with a timeline of each step on the record. Each business should confirm its own compliance and record-keeping obligations, as this workflow is a tool to support that process rather than a guarantee of compliance.

Ready to use this workflow?

Create a free account and customise this workflow for your business.

Tiling installation quality checklist Workflow | assess.one