Solar installation pre-start checklist Workflow

Captures a pre-start safety checklist for solar installation jobs, routes based on the safety result, and manages the stop-work/clearance loop with the supervisor until the site is confirmed safe to start.

Solar installation businesses operating across multiple crews and sites need a consistent, visible way to confirm pre-start safety before work begins, rather than relying on informal checks that vary by installer. This workflow captures a structured pre-start checklist from installers, automatically routes the record based on the recorded safety result, and manages a stop-work and clearance loop with a supervisor until the site is confirmed safe to start. Installers submit checklists through a request form, supervisors are assigned review tasks when work is stopped, and the record's status and timeline reflect progress from Submitted through to Cleared or Work Stopped.

Business Outcomes

  • Supports more consistent application of pre-start safety checks across installers and sites
  • Helps reduce delays by automatically routing safe and unsafe results to the correct next step
  • Gives supervisors a structured task for recording issues and corrective actions when work is stopped
  • Makes it easier to track a site's safety status and history through a single record timeline
  • Improves visibility of stop-work situations and their resolution across the workspace

Workflow Steps

Steps

  1. 1
    Create pre-start checklist recordcreate record

    Registers the submitted pre-start checklist as a record.

  2. 2
    Set status to Submittedupdate record

    Marks the checklist as Submitted on creation.

  3. 3
    Route on pre-start result

    Branches the workflow based on the installer's recorded safety result.

    result: "Safe to start"→Set status to Cleared
    result: "Not safe - stop work"→Set status to Work Stopped
    Default→End
  4. 4
    Set status to Clearedupdate record

    Marks the checklist as Cleared because the result was Safe to start.

  5. 5
    Email installer: cleared to startsend email

    Notifies the installer the site is cleared to start work.

  6. 6
    Set status to Work Stoppedupdate record

    Marks the checklist as Work Stopped because the result was Not safe - stop work.

  7. 7
    Email installer: work must not startsend email

    Notifies the installer that work must not start due to safety issues.

  8. 8
    Supervisor: review issues and corrective actionscreate task

    Assigns the supervisor a task to record issues, corrective actions taken, and whether it is now safe to start.

  9. 9
    Save supervisor review to recordupdate record

    Persists the supervisor's issues, corrective actions, and safety decision to the checklist record.

  10. 10
    Route on supervisor safety decision

    Branches based on whether the supervisor confirms the site is now safe to start.

    supervisor_safe_decision: "Safe to start"→Set status to Cleared
    supervisor_safe_decision: "Not safe"→Return to supervisor for further review
    Default→End
  11. 11
    Return to supervisor for further reviewrestart from step

    Sends the checklist back to the supervisor for further review since it is still not safe.

  12. 12
    Set status to Clearedupdate record

    Marks the checklist as Cleared following the supervisor's safety confirmation.

  13. 13
    Email installer: cleared to start with corrective actionssend email

    Notifies the installer that work is now cleared to start and lists the corrective actions taken.

Fields

  • Installer name*
  • Installer email*
  • Site address*
  • Date*
  • Job reference*
  • System size (kW)*
  • +18 more fields

Forms

Solar Installation Pre-Start Checklist

20 fields

Data Views

Pre-Start Checklists

site_address, date, job_reference, system_size_kw +2 more

Dashboard Widgets

Pre-starts by pre-start status

Recommended integrations

Setup the following integrations to extend workflow capability.

  • Send email in the workflow

    AWS SES logoAWS SES
solar installation pre-start checklistsolar and batterychecklistpre-starttradetrades

Similar Workflows

Similar Categories

FAQs

What does this workflow record for each pre-start checklist?

Each submission creates a record with a reference number, a status, and a timeline capturing every step that occurs. The record stores all checklist answers submitted by the installer, including roof and safety details, photos, and the recorded result, along with any supervisor review information entered later. Status values such as Submitted, Cleared, and Work Stopped are visible on the record and in table views and dashboards.

Who is involved in the pre-start checklist and clearance process?

Installers complete the initial pre-start checklist through a request form, providing site, safety, and hazard information along with their recorded result. If the result indicates work should stop, a supervisor is assigned a task to review the issues, record corrective actions, and decide whether the site is now safe to start. Installers receive email notifications at key points, including when the site is cleared or when work must not start.

What happens if the installer records a 'Not safe - stop work' result?

The record's status is set to Work Stopped and the installer is emailed to confirm that work must not start. A supervisor is then assigned a task to review the issues found, record corrective actions taken, and determine whether the site is now safe to start. This information is saved to the record before the workflow proceeds.

How is the supervisor's safety decision handled?

Once the supervisor records whether the site is now safe to start, the workflow routes based on that decision. If the supervisor confirms it is safe, the status is set to Cleared and the installer is emailed with the corrective actions taken. If the supervisor determines it is still not safe, the checklist is returned to the supervisor for further review, and the record's timeline reflects this ongoing cycle.

How do we change or customise this workflow?

A workspace admin can describe the desired change in plain English or edit the steps directly in the workflow editor, such as adjusting checklist questions or notification wording. Earlier versions of the workflow are kept, so changes can be reviewed or reverted if needed. This allows the checklist and routing logic to be adapted as site safety requirements evolve.

Can the checklist questions or roof and hazard details be adjusted?

Yes, the fields on the request form, including roof type, fall protection, hazard details, and photo requirements, can be edited in the workflow editor or updated by describing the change in plain English. Any changes take effect for future submissions while the record and timeline of past checklists remain intact. This makes it straightforward to tailor the checklist to different job types or regulatory considerations relevant to the business.

How does the workflow notify installers of the outcome?

Built-in email is used to notify installers at each key decision point, including when the site is cleared to start, when work must not start, and when the site is cleared after corrective actions. A workspace can optionally send these emails through its own AWS SES account. Installers do not need an account to receive or respond to these notifications.

What visibility does the workspace have into checklist progress and stop-work situations?

Table views and dashboards display checklist records by status, making it possible to see at a glance which sites are Submitted, Cleared, or in a Work Stopped state. Workspace activity, including task assignments and status changes, is logged against each record. Each business should confirm this level of record-keeping meets its own safety and compliance obligations.