Workflow Template

Cladding installation inspection Workflow

Captures a cladding installation inspection, records pass/fail checks per elevation, notifies the builder/client of the result, and manages a rectification and re-inspection loop until the installation passes.

This workflow is designed for building inspectors and cladding installation teams who need a consistent way to record installation checks and manage failures through to resolution. It automates the intake of inspection data per elevation, routes the result to pass or fail handling, notifies the builder or client by email, and manages a rectification and re-inspection loop until the installation passes. The outcome is a single record per job that tracks status, timeline, and rectification history from first submission to final sign-off.

Business Outcomes

  • Faster turnaround between a failed inspection and a documented re-inspection outcome
  • Reduced manual chasing of installers and clients through automatic status emails
  • Clearer audit trail of pass/fail checks per elevation, photos, and rectification notes on each record
  • More consistent handling of rectification cycles through a repeatable loop rather than ad hoc follow-up
  • Improved visibility of job status across a table view without manual spreadsheet updates

Workflow Steps

Steps

  1. 1
    Create Inspection Recordcreate record

    Registers the submitted inspection as a record.

  2. 2
    Set Status: Submittedupdate record

    Marks the inspection record as Submitted.

  3. 3
    Send Acknowledgement Emailsend email

    Emails the inspector an acknowledgement with the reference number.

  4. 4
    Route on Overall Result

    Routes to pass or fail handling based on the overall inspection result.

    overall_result: "Pass"→Set Status: Passed
    overall_result: "Fail"→Set Status: Rectification
    Default→End
  5. 5
    Set Status: Passedupdate record

    Marks the inspection record as Passed.

  6. 6
    Email Client: Passedsend email

    Emails the builder/client that the cladding passed the installation inspection.

  7. 7
    Set Status: Rectificationupdate record

    Marks the inspection record as requiring Rectification.

  8. 8
    Cladding Installer: Rectification Taskcreate task

    Assigns the cladding installer a task to fix the failed checks within 2 days.

  9. 9
    Inspector: Re-inspection Taskcreate task

    Assigns the inspector a task to re-inspect the rectified work within 1 day.

  10. 10
    Save Re-inspection Data to Recordupdate record

    Persists the rectification and re-inspection details to the record.

  11. 11
    Route on Re-inspection Result

    Routes to final pass handling or back to the cladding installer if the re-inspection fails.

    reinspection_result: "Pass"→Set Status: Passed
    reinspection_result: "Fail"→Loop Back to Rectification
    Default→End
  12. 12
    Loop Back to Rectificationrestart from step

    Restarts the rectification and re-inspection cycle for the cladding installer.

  13. 13
    Set Status: Passedupdate record

    Marks the inspection record as Passed after successful re-inspection.

  14. 14
    Email Client: Rectified and Passedsend email

    Emails the builder/client that the cladding was rectified and passed the installation inspection.

Fields

  • Inspector Name*
  • Inspector Email*
  • Builder/Client Name*
  • Builder/Client Email*
  • Site Address*
  • Job Reference*
  • +14 more fields

Forms

Cladding Installation Inspection

19 fields

Data Views

Cladding Inspections

site_address, job_reference, cladding_type, overall_result +1 more

Dashboard Widgets

Inspections by Inspection Status

Recommended integrations

Setup the following integrations to extend workflow capability.

  • Send email in the workflow

    AWS SES logoAWS SES
cladding installation inspectionrendering and claddinginspectiontradetrades

Similar Workflows

Similar Categories

FAQs

Why should we automate cladding installation inspections instead of using paper checklists or spreadsheets?

Manual checklists and spreadsheets rely on someone remembering to email results, chase rectification work, and update a tracker by hand, which introduces delay and inconsistency. This workflow captures the same pass/fail checks per elevation but automatically creates a record, sends acknowledgement and result emails, and assigns rectification and re-inspection tasks without staff needing to coordinate each step manually. The result is a faster, more consistent process with a timeline already built into each record.

What is the ROI of using this workflow compared to handling failed inspections manually?

When an inspection fails, the workflow automatically assigns a rectification task to the installer and a re-inspection task to the inspector with defined turnaround expectations, removing the need for phone calls or follow-up emails to keep the job moving. This reduces the administrative time spent tracking down status updates and reduces the risk of a failed job stalling because no one followed up. Over multiple jobs, the time saved on coordination and email drafting can be significant for inspection teams handling a steady volume of sites.

Who is involved in this workflow and what are they responsible for?

The inspector submits the initial inspection via the request form and later completes a re-inspection task if rectification is required. The cladding installer is assigned a rectification task with a 2-day window to fix failed checks and record rectification details and photos. The builder or client receives email updates when the installation passes, or when it is rectified and passes, without needing to log in anywhere.

What happens if the overall inspection result is a fail?

When the Overall Result is Fail, the record status changes to Rectification and the cladding installer is assigned a task to fix the failed checks within 2 days, recording Rectification Done and Rectification Photos. Once that task is complete, the inspector is assigned a re-inspection task within 1 day to record the Re-inspection Result and Re-inspection Notes. These details are then saved to the record before the next routing decision.

What happens if the re-inspection also fails?

If the re-inspection result is Fail, the workflow loops back to the rectification step, reassigning the task to the cladding installer to address the outstanding issues. This cycle of rectification and re-inspection continues until the installation passes, with each pass through the loop adding to the record's timeline. This keeps the responsibility with the installer and inspector until the job meets the required standard.

Can we customise the checks or thresholds used in this inspection form?

Yes, the workflow can be changed by describing the desired change in plain English or by editing the steps directly in the workflow editor, and earlier versions of the workflow are kept. This makes it straightforward to add elevation-specific checks, change task deadlines, or adjust the wording of client emails as inspection standards evolve. Any changes apply to future runs of the workflow without needing a development project.

How does the client find out the result of the inspection?

The builder or client receives an email when the installation passes on first inspection, and a separate email if it was rectified and then passed on re-inspection. These emails are sent automatically as part of the workflow once the relevant status is set, so the client does not need to request an update or create an account. All communication is tied to the job's reference number for easy tracking.

What information is kept on the inspection record for future reference?

Each inspection is stored as a record with a reference number, a status, and a timeline of what happened, including the original elevation checks, photos, and overall result submitted through the request form. Rectification and re-inspection details, including Rectification Photos and Re-inspection Notes, are also saved to the record once those tasks are completed. Businesses should confirm their own record-keeping obligations, but this timeline provides a clear history of each job's inspection outcomes.

Do the inspector, installer, or client need to create an account to use this workflow?

The inspector submits the initial inspection through a public request form, and the builder or client receives result notifications by email, so neither needs an account to participate. Tasks such as the rectification and re-inspection work are assigned to team members within the workspace, who complete them as part of their normal task list. This keeps external participation simple while internal task ownership stays clear.

Ready to use this workflow?

Create a free account and customise this workflow for your business.