Waterproofing & Leak Detection
Workflow templates for waterproofers and leak detection specialists, covering bathroom waterproofing quotes, water leak detection requests and inspection reports, and balcony waterproofing assessments. Substrate readiness inspections, membrane application records, flood tests and completion handover checklists are included too.
Benefits
- Report leak detection findings to customers with photos
- Record membrane application and flood tests on the job
- Check substrate readiness before waterproofing starts
Common Use Cases
Waterproofing & Leak Detection Templates(8)
Balcony Waterproofing Assessment Workflow
Captures a balcony waterproofing inspection, routes the report through manager review (with revision loop back to the inspector), emails the approved report to the customer, and triggers a quote task when repairs are recommended.
Bathroom Waterproofing Quote Request Workflow
Manages a waterproofing quote request from initial submission through site inspection, quoting, customer acceptance, job scheduling, completion, and post-job feedback collection.
Leak Detection Inspection Report Workflow
Captures a leak detection inspection report, routes it through senior technician review (with a bounded revision loop back to the inspector), emails the approved report to the customer, and if repair work is recommended assigns an estimator to prepare a quote.
Water Leak Detection Request Workflow
Manages water leak detection requests from intake through office scheduling, technician inspection, and outcome-based customer communication and follow-up.
Waterproofing Completion Handover Workflow
Captures waterproofing job completion details, runs a supervisor quality check with rework loop, obtains customer sign-off with an issue-resolution loop, and finalises handover with thank-you and feedback follow-up.
Waterproofing Flood Test Workflow
Captures a waterproofing flood test inspection, records checks and overall result, notifies the builder/client, and if a leak is found routes through a rectification task and re-inspection cycle (up to 2 loops) before confirming the area is watertight.
Waterproofing Membrane Record Workflow
Captures a waterproofing membrane application record, routes it to a supervisor for quality-control review, loops back to the waterproofer for correction if needed, then finalises and emails the membrane record to the builder or client.
Waterproofing Substrate Inspection Workflow
Captures a waterproofing substrate readiness inspection, acknowledges the submission, and either confirms the substrate is ready for membrane or routes failed checks through a rectification and re-inspection loop (up to 2 cycles) before notifying the builder/client of the final result.
Frequently Asked Questions
What Waterproofing & Leak Detection workflow templates are included?
Waterproofing & Leak Detection includes templates for bathroom waterproofing quote requests, water leak detection requests, leak detection inspection reports, balcony waterproofing assessments, waterproofing substrate readiness inspections, membrane application records, flood tests and inspections, and completion certificate and handover checklists.
Who are the Waterproofing & Leak Detection templates for?
They're designed for waterproofers, leak detection specialists and remedial builders. Customers request inspections and quotes through a public form, and your team records findings, membrane details and flood tests on their tasks.
Can I change a waterproofing template to suit my business?
Yes. Publish the template and it runs straight away, with no installation. Describe the change in plain English — for example, add a moisture meter reading or a remedial quote step — or edit the steps in the workflow editor. Earlier versions are kept.
