Generator Installation and Changeover Workflow

Captures generator commissioning test results, routes failures to a rectification loop with re-testing, hands the system over to the customer once commissioned, and follows up with a handover summary email and a delayed feedback request.

This workflow is designed for electrical contractors and generator installation businesses that commission standby and changeover generator systems for commercial or residential customers. It automates the capture of commissioning test data, routes failed tests into a rectification and re-test cycle, manages customer handover once the system passes, and follows up with a handover summary email and a delayed feedback request. The result is a consistent, trackable commissioning process from initial test through to customer sign-off, without relying on spreadsheets or manual follow-up.

Business Outcomes

  • Reduces time spent manually tracking commissioning test results and rectification cycles
  • Supports faster turnaround from failed test to re-test and final commissioning
  • Improves consistency of customer handover information and documentation
  • Helps reduce missed or delayed customer follow-up after handover
  • Makes it easier to see the status of every generator installation at a glance

Workflow Steps

Steps

  1. 1
    Create Commissioning Recordcreate record

    Creates the generator commissioning record from the submitted form data.

  2. 2
    Set Status: Commissioningupdate record

    Sets the record status to Commissioning.

  3. 3
    Route on Overall Result

    Routes based on whether the commissioning test result passed or failed.

    result: "Pass"→Set Status: Commissioned
    result: "Fail"→Set Status: Rectification
    Default→End
  4. 4
    Set Status: Rectificationupdate record

    Sets the record status to Rectification when the commissioning test fails.

  5. 5
    Rectification Taskcreate task

    Assigns the electrician a task due in 2 days to record the fault, the fix and the retest result.

  6. 6
    Save Rectification Detailsupdate record

    Persists the fault, fix and retest result to the record.

  7. 7
    Route on Retest Result

    Routes based on whether the retest passed or still failed.

    retest_result: "Pass"→Set Status: Commissioned
    retest_result: "Fail"→Loop Back to Rectification
    Default→End
  8. 8
    Loop Back to Rectificationrestart from step

    Restarts the rectification cycle when the retest still fails, up to 2 additional times.

  9. 9
    Set Status: Commissionedupdate record

    Sets the record status to Commissioned once the test result (or retest) passes.

  10. 10
    Customer Handover Taskcreate task

    Assigns the electrician a task due in 1 day to hand the generator over to the customer and record handover details.

  11. 11
    Save Handover Detailsupdate record

    Persists the handover confirmation, service interval and warranty period to the record.

  12. 12
    Set Status: Handed Overupdate record

    Sets the record status to Handed Over.

  13. 13
    Email Handover Summarysend email

    Emails the customer a handover summary with generator details, changeover procedure, service interval and warranty period.

  14. 14
    Wait 2 Days Before Feedback Request

    Pauses for two days before requesting customer feedback.

  15. 15
    Request Customer Feedbackrequest external input

    Emails the customer a short feedback form with a 1-5 rating and comments.

Fields

Show all 34 fields

FormGenerator Commissioning Form

  • Electrician Name*· Text
  • Customer Name*· Text
  • Customer Email*· Email
  • Customer Mobile*· Phone
  • Site Address*· Text
  • Generator Make*· Text
  • Generator Model*· Text
  • Generator Serial Number*· Text
  • Rating (kVA)*· Number
  • Fuel Type*· Choice
  • Changeover Type*· Choice
  • Circuits Supplied*· Long text
  • Commissioning Date*· Date
  • Test: Changeover Switch Operation*· Choice
  • Test: Interlock Preventing Backfeed to Grid*· Choice
  • Test: Generator Start and Run*· Choice
  • Test: Supply Restored on Changeover Back*· Choice
  • Test: Earthing and Bonding*· Choice
  • Test: Safety Labelling*· Choice
  • Output Voltage (V)*· Number
  • Frequency (Hz)*· Number
  • Load Test (kW)*· Number
  • Transfer Time (seconds)*· Number
  • Photos· File upload
  • Overall Result*· Choice

TaskRectification Task

  • Fault Description*· Long text
  • Fix Description*· Long text
  • Retest Result*· Choice

TaskCustomer Handover Task

  • Customer Shown Safe Changeover & Start-up Procedure*· Checkbox
  • Service Interval*· Text
  • Warranty Period*· Text

Other fields

  • Commissioning Status· Choice
  • Feedback Rating (1-5)· Number
  • Feedback Comments· Long text
  • Electrician Name*
  • Customer Name*
  • Customer Email*
  • Customer Mobile*
  • Site Address*
  • Generator Make*

Forms

Generator Commissioning Form

25 fields

Data Views

Generator Commissioning Records

customer_name, site_address, generator_make, generator_model +4 more

Dashboard Widgets

Generators by Commissioning Status

Recommended integrations

Setup the following integrations to extend workflow capability.

  • Send email in the workflow

    AWS SES logoAWS SES
generator installation / changeover testelectricaltradetrades

Similar Workflows

Similar Categories

FAQs

Why should we automate generator commissioning testing instead of using paper checklists or spreadsheets?

Manual checklists and spreadsheets make it hard to track which generators are still in rectification, which have passed, and which are awaiting handover. This workflow creates a record with a reference number, status and timeline for every commissioning test, so staff can see progress at a glance without chasing paperwork. It also standardises the data captured on every job, from test results to handover details, reducing the risk of incomplete records.

What is the ROI of using this workflow compared to handling rectification and handover manually?

The workflow removes the need for someone to manually follow up on failed tests, remind electricians about re-testing, or chase handover documentation. Tasks are automatically assigned with due dates, and the record status updates as work progresses, which reduces administrative time per job. Over multiple installations, this time saving compounds, while the handover summary email and feedback request run automatically without staff intervention.

How does the rectification loop work when a commissioning test fails?

When the Overall Result is Fail, the record status is set to Rectification and the electrician is assigned a task due in 2 days to record the fault, the fix and the retest result. If the retest still fails, the workflow loops back to rectification for up to 2 additional cycles before the record status is set to Commissioned once a test or retest passes. Every fault description, fix description and retest result is saved to the record, building a full history in the timeline.

What happens at the customer handover stage?

Once the record status is set to Commissioned, the electrician is assigned a task due in 1 day to hand the generator over to the customer and record whether the customer was shown the safe changeover and start-up procedure, along with the service interval and warranty period. These details are saved to the record and the status changes to Handed Over. The customer is then emailed a handover summary covering generator details, the changeover procedure, service interval and warranty period.

Can we customise the test fields or handover questions in this workflow?

Yes. Workflows in assess.one can be changed by describing the change in plain English or by editing the steps directly in the workflow editor, and earlier versions are kept. This means fields on the request form, the rectification task, or the handover task can be adjusted to match a business's specific commissioning checklist or handover requirements.

Who is responsible for each task in the workflow, and do customers need to log in anywhere?

Tasks such as the Rectification Task and Customer Handover Task are assigned to team members within the workspace, typically the electrician on the job. Customers take part only through forms emailed to them, such as the handover summary and the feedback request, and never need to create an account.

How does the delayed feedback request work, and what does it capture?

Two days after the handover summary email is sent, the workflow automatically emails the customer a short feedback form asking for an overall satisfaction rating from 1 to 5 and any comments or suggestions. Because this is a form emailed to the customer, their responses are saved directly to the record, adding to the job's timeline without requiring any manual data entry by staff.

What data is captured if a generator fails commissioning more than once?

The workflow supports up to 2 additional rectification cycles after the first failed test, looping back through the Rectification Task each time a retest fails. Each cycle's fault description, fix description and retest result are saved to the record, so the full history of what was tried and the outcome of each attempt is visible in the record's timeline.

Can this workflow help with compliance or audit requirements for generator commissioning?

The workflow records each test result, status change, rectification detail and handover confirmation in the record's timeline, which can support a business's own documentation practices. However, each business should confirm its own regulatory and compliance obligations, as the workflow itself does not determine or guarantee compliance.