Earthworks level / compaction inspection Workflow

Captures earthworks level and compaction inspection results, notifies stakeholders, and manages rectification and re-inspection cycles until the earthworks pass.

Earthworks fail inspections often stall on-site because rectification, re-inspection and client updates are tracked manually across emails and spreadsheets. This workflow captures level and compaction results from a submitted form, sets the inspection status, and automatically routes a pass straight to client notification or a fail into a rectification and re-inspection cycle. Inspectors, earthworks crews and site managers all work off the same record, which keeps a full timeline of every check, task and result until the earthworks pass.

Business Outcomes

  • Faster turnaround between a failed inspection and rectification work starting
  • Fewer missed client notifications on pass or rectified-pass results
  • Clearer visibility into how many rectification cycles a job needed
  • Reduced admin time spent chasing inspectors and crews for updates
  • A consistent, timestamped record of every inspection and re-inspection outcome

Workflow Steps

Steps

  1. 1
    Create Inspection Recordcreate record

    Creates the earthworks inspection record from the submitted form data.

  2. 2
    Set Status to Submittedupdate record

    Sets the inspection status to Submitted.

  3. 3
    Send Acknowledgement Emailsend email

    Emails the inspector an acknowledgement with the inspection reference number.

  4. 4
    Route on Overall Result

    Routes the workflow based on the overall inspection result.

    overall_result: "Pass"→Set Status to Passed
    overall_result: "Fail"→Set Status to Rectification
    Default→End
  5. 5
    Set Status to Passedupdate record

    Sets the inspection status to Passed after a first-time pass result.

  6. 6
    Email Client Pass Notificationsend email

    Emails the builder or client that the earthworks passed the level and compaction inspection.

  7. 7
    Set Status to Rectificationupdate record

    Sets the inspection status to Rectification after a failed result.

  8. 8
    Earthworks Crew Rectification Taskcreate task

    Assigns the earthworks crew a task to rectify the failed checks within 2 days.

  9. 9
    Save Rectification Details to Recordupdate record

    Persists the rectification work notes and photos to the record.

  10. 10
    Inspector Re-inspection Taskcreate task

    Assigns the inspector a task to re-inspect the rectified area within 1 day.

  11. 11
    Save Re-inspection Result to Recordupdate record

    Persists the re-inspection result and notes to the record.

  12. 12
    Route on Re-inspection Result

    Routes the workflow based on the re-inspection outcome.

    reinspection_result: "Pass"→Set Status to Passed
    reinspection_result: "Fail"→Loop Back to Earthworks Crew
    Default→End
  13. 13
    Loop Back to Earthworks Crewrestart from step

    Sends the record back to the earthworks crew for further rectification, up to 2 additional cycles.

  14. 14
    Set Status to Passedupdate record

    Sets the inspection status to Passed after successful rectification and re-inspection.

  15. 15
    Email Client Rectified Pass Notificationsend email

    Emails the builder or client that the earthworks was rectified and passed the level and compaction inspection.

Fields

  • Inspector Name*
  • Inspector Email*
  • Builder/Client Name*
  • Builder/Client Email*
  • Site Address*
  • Job Reference*
  • +19 more fields

Forms

Earthworks Level & Compaction Inspection Form

20 fields

Data Views

Earthworks Inspections

site_address, job_reference, area_tested, overall_result +1 more

Recommended integrations

Setup the following integrations to extend workflow capability.

  • Send email in the workflow

    AWS SES logoAWS SES
earthworks level / compaction inspectionexcavation and earthmovinginspectiontradetrades

Similar Workflows

Similar Categories

FAQs

How do I set up this earthworks inspection workflow for my team?

Publish the template in your workspace and it's ready to run straight away, no installation needed. Share the public request form link with inspectors, or send it out ahead of site visits, and assign your earthworks crew and inspector as members who'll receive the rectification and re-inspection tasks.

What happens when an inspection fails?

The record status changes to Rectification and the earthworks crew gets a task to fix the failed checks within 2 days. Once they mark it done with photos and notes, those details save to the record and the inspector gets a re-inspection task within 1 day.

What happens if the re-inspection also fails?

The record loops back to the earthworks crew for further rectification, and this can repeat for up to 2 additional cycles. Each cycle's rectification and re-inspection notes are saved to the record, so the full history of attempts is visible in the timeline.

Can I change the rectification or re-inspection deadlines?

Yes. Describe the change you want in plain English, such as changing the 2-day rectification window or the 1-day re-inspection window, and the workflow updates. Earlier versions of the workflow are kept, so you can review what changed.

Who is responsible for each step in this workflow?

The inspector submits the initial form and completes re-inspection tasks, the earthworks crew handles rectification tasks, and the builder or client receives pass and rectified-pass email notifications. All of these are workspace members assigned directly to the relevant task on the record.

Does the builder or client need an account to get updates?

No. They receive email notifications when the earthworks pass, whether that's on the first inspection or after rectification, without ever needing to log in. They take part through emailed forms or the public request form when required, not through an account.

What information gets saved to the inspection record?

Everything the workflow waits on gets saved to the record, including rectification done status, rectification photos, re-inspection result and re-inspection notes. Each inspection also keeps a reference number, status and full timeline of what happened, viewable from your dashboard.

Can I customise the fields on the inspection request form?

Yes, you can edit the form fields in the workflow editor to match your own compaction testing standards or add extra checks. Since it's your workflow, you control what data is captured on submission, from test method to layer thickness and drainage checks.

How do I track how many inspections are currently in rectification?

Table views and dashboards show records grouped by status, so you can see at a glance which inspections are Submitted, in Rectification, or Passed. This gives site managers a quick way to spot jobs that are cycling through rectification more than once.