assess.one – AI-powered business operations platform

Workflow Template

Battery installation site assessment Workflow

Captures a battery installation site inspection, routes the report through solar designer review (with a revision loop back to the inspector), emails the approved report to the customer, and triggers a quote task when a battery installation is recommended.

This workflow is designed for solar and battery installation businesses that need a consistent way to capture site inspection data and get it reviewed before it reaches the customer. It automates the path from field inspection through solar designer review, a revision loop back to the inspector when changes are needed, and an emailed report to the customer, then triggers a quote task whenever a battery installation is recommended. The result is a structured record of each site assessment, with status tracking from submission through to a closed or quoted outcome.

Business Outcomes

  • Reduces back-and-forth between inspectors and designers by keeping revision requests and updates on a single record
  • Speeds up delivery of approved site reports to customers via built-in email
  • Creates a clear timeline of review decisions, revisions and status changes for each site assessment
  • Helps route qualified battery installation opportunities to an estimator without manual handoffs
  • Improves consistency of site inspection data captured across inspectors and locations

Workflow Steps

Steps

  1. 1
    Create Site Assessment Recordcreate record

    Registers the submitted inspection as a site assessment record.

  2. 2
    Set Status: Report Reviewupdate record

    Sets the record status to Report Review after the inspection is submitted.

  3. 3
    Solar Designer: Review Reportcreate task

    Assigns the solar designer a task to review the inspection report and record a decision.

  4. 4
    Route on Review Decision

    Routes the workflow based on the solar designer's review decision.

    review_decision: "Approved"→Set Status: Report Sent
    review_decision: "Changes needed"→Set Status: Revising
    Default→End
  5. 5
    Set Status: Revisingupdate record

    Sets the record status to Revising when changes are needed.

  6. 6
    Inspector: Update Reportcreate task

    Assigns the inspector a task to update the defects found and recommended work based on the designer's comments.

  7. 7
    Save Revised Report Detailsupdate record

    Saves the inspector's updated defects and recommended work to the record and resets status to Report Review.

  8. 8
    Return to Designer Reviewrestart from step

    Restarts the review cycle from the designer review task after the inspector's updates.

  9. 9
    Set Status: Report Sentupdate record

    Sets the record status to Report Sent once the designer approves the report.

  10. 10
    Email Customer the Reportsend email

    Sends the customer the site suitability, proposed location, switchboard findings, and recommended battery size and backup circuits.

  11. 11
    Route on Battery Recommendation

    Routes based on whether a battery installation is recommended.

    battery_recommended: "Yes"→Set Status: Quote to Follow
    battery_recommended: "No"→Set Status: Closed
    Default→Set Status: Closed
  12. 12
    Set Status: Quote to Followupdate record

    Sets the record status to Quote to Follow because a battery installation is recommended.

  13. 13
    Estimator: Prepare Battery Installation Quotecreate task

    Assigns the estimator a task to prepare a battery installation quote without waiting for its completion.

  14. 14
    Set Status: Closedupdate record

    Sets the record status to Closed because no battery installation is recommended.

Fields

  • Inspector Name*
  • Customer Name*
  • Customer Email*
  • Customer Mobile*
  • Site Address*
  • Inspection Date*
  • +19 more fields

Forms

Battery Installation Site Inspection

22 fields

Data Views

Battery Site Assessments

customer_name, site_address, inspection_date, site_suitability +1 more

Dashboard Widgets

Assessments by Report Status

Recommended integrations

Setup the following integrations to extend workflow capability.

  • Send email in the workflow

    AWS SES logoAWS SES
battery installation site assessmentsolar and batterytradetrades

Similar Workflows

Similar Categories

FAQs

Why should we automate battery installation site assessments instead of managing them manually?

Manually tracking site inspections, designer reviews and revision requests across email and spreadsheets makes it easy to lose track of which report version a customer is waiting on. This workflow keeps the inspection data, review decisions and revision history on one record with a visible status, so anyone in the workspace can see where a report stands. It also automates the customer email and the handoff to an estimator, reducing the manual steps needed once a report is approved.

What is the ROI of using this workflow compared to handling reviews over email?

Email-based review cycles often require someone to manually track which report version is current and chase inspectors for changes. This workflow removes that overhead by assigning the review task directly to the solar designer and looping revisions back to the inspector automatically, with each update saved to the record. Teams typically see time savings from fewer status check-ins and faster turnaround from inspection to customer report.

Who is involved in this workflow and what do they do?

The inspector submits the initial site assessment through the request form and updates the report if the solar designer requests changes. The solar designer reviews the submitted report, records a decision of Approved or Changes needed along with comments, and can trigger the revision loop. If a battery installation is recommended, an estimator receives a task to prepare a quote, though the workflow does not wait for that task to finish.

What happens when the solar designer requests changes to the report?

When the review decision is Changes needed, the record status is set to Revising and the inspector receives a task to update the defects found and recommended work based on the designer's comments. Once the inspector submits those updates, they are saved to the record, the status resets to Report Review, and the workflow returns to the designer review task to restart the cycle. This loop can repeat until the designer approves the report.

What happens after the solar designer approves the report?

Once the review decision is Approved, the record status changes to Report Sent and the workflow automatically emails the customer the site suitability, proposed battery location, switchboard findings, recommended battery size and backup circuits. The workflow then checks whether a battery installation is recommended to decide the next step.

How does the workflow decide whether to create a quote task?

After the approved report is emailed to the customer, the workflow checks the Battery Installation Recommended field. If it is Yes, the status is set to Quote to Follow and an estimator receives a task to prepare a battery installation quote, with their quote preparation notes kept on that task. If it is No, the record status is set to Closed.

Can we customise the fields captured on the site assessment form?

Yes, the request form fields such as switchboard capacity, wall construction, clearances and energy use from recent bills can be adjusted by describing the change in plain English or editing the steps directly in the workflow editor. Earlier versions of the workflow are kept, so changes can be reviewed or reverted if needed.

Does the customer need to log in to receive or respond to the report?

No, customers take part through the public request form and through forms emailed to them, without needing to create an account. In this workflow, the customer receives the approved site report by email directly to the address they provided.

How is progress on a site assessment tracked?

Each submitted inspection becomes a record with a reference number, a status such as Report Review, Revising, Report Sent, Quote to Follow or Closed, and a timeline showing what happened at each step. Table views and dashboards display records by status, making it straightforward to see which assessments are awaiting review, revision or a quote.

What information from the inspection is saved on the record versus kept on a task?

Fields captured on the request form, along with the solar designer's Review Decision and Comments and the inspector's Updated Defects Found and Updated Recommended Work, are saved to the record because the workflow waits for those tasks. The estimator's Quote Preparation Notes stay with that task, shown in the record's task list, since the workflow does not wait for the quote task to complete.

Ready to use this workflow?

Create a free account and customise this workflow for your business.

Battery installation site assessment Workflow | assess.one